Water Fee Schedule
Water Fee Schedule
Revised 07.01.2022
ANY OUTSTANDING TOWN BILLS MUST BE PAID IN FULL BEFORE PERMIT WILL BE ISSUED.
$350.00 Non-refundable permit fee must be paid within 5 days of approval in order to be valid. Permits are good for a period of one year from the date of approval.
Fee for 1-year Extensions granted for Approved Permits is the current permit fee.
Water Meters:
New Meter Fee: $650.00 (3/4” – 1” only. 1 ½” and up contact Water Dept)
Permit Application Fee: $350.00
Public Hearing Fees: $300.00 Application/Administrative Fee
$250.00 Engineering Review Fee
*2 separate checks shall be submitted at time of application
Water Rates:
$ 5.66 per 100 Cubic Foot (CF) up to 1000 CF; $8.49 1100-4000 CF; $16.98 4000+ CF
Quarterly Base Fees:
5/8” $78.37 ($21.02 - 1 month; $42.04 - 2 months, $63.04- 3 months)
>5/8 Base Charge Usage $397.86
FEMA Charges for Vehicles – Storm Related *as of August 2011
Backhoe $38.00
Truck $35.00
Miscellaneous Fees:
Final Reading Fee: $50.00, $100.00, & $200.00
Backflow Prevention Insp.: $70.00 Per Inspection
Hydrant Flow Test Fee: $150.00
Flow test $160.00
Connection Fees: Domestic & Fire Protection Connection Fees
**Infrastructure Upgrade Fee- 4% of the cost based on the total cost of project from Building Permit**
¾” – 1” $2,000.00 Connection Fee
¾” – 1” $4,000.00 If Dudley Water taps main and brings service to curb stop
** this includes the connection fee
2” $3,000.00 **Dudley Water DOES NOT tap the main for any size over
1”, these are connection fees only
3” $4,000.00
4” $5,000.00
6” – 12” $8,000.00